2010年8月17日
property status update
Please note the cracks in the ceilings for the ground floor front reception room and the study right next to it.
And the kitchen needs a new set of tiling.
Well, the kitchen is too wide and it can be divided to create a downstairs bath tub area and the narrower new kitchen sink side wall.
登録:
コメントの投稿 (Atom)
0 件のコメント:
コメントを投稿